logo

ZPM-100 Hydraulic Automatic modular circular Climbing Formwork steel and timber systems

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Falsework & Formwork: problem solving - KHL

Tear,down work began in April 2011, requiring excavation work up to 3m deep| Piles and columns were built onto individual and strip footings| An individual footing measured 7m x 9m at a thickness of 1|60m| In total, 110 tons of steel and 500m³ C30/37 concrete were used| Modular universal formwork was employed as foundation formwork|

Civil Engineering:

MF - 240 - Simple Climbing, Crane handled - platform width 2!40 m! these brackets can also be fitted with automatic climbers SKE-50 which is a hydraulic system with 5T carrying capacity or SKE-100 with 10T carrying capacity!

circular steel beam, circular steel beam Suppliers and

ZPM-100 Hydraulic Automatic modular circular Climbing Formwork steel and timber systems _ US $6691-$7360 / Set 10 Sets (Min ___

Slab Formwork Systems on sales - Quality Slab Formwork

Column Formwork Systems_ Easy Connection Column Formwork Systems Steel Frame / ABS Coating Plywood Material_ 120 Adjustable Steel Column Formwork , Circular Formwork Systems C,SF120_ Customized Concrete Column Formwork For Beams Columns And Slabs C,SF65_ 120 Adjustable Column Formwork Systems Outdoor High Bearing Capacity_ Slab Formwork Systems

FORMWORK - Structural

The SKE system The modular system for automatic climbing * Free positioning of brackets and automatic climbers as single_section climbing scaffold * Lift heights up to 5,50 m * Formwork systems` • wall formwork FF 20 and large_area formwork Top 50 • framed formwork Framax and Alu_Framax * Climbing speed 5 min/m SKE 50 * Load_carrying ,,,

FORMWORK - Structural

The SKE system The modular system for automatic climbing * Free positioning of brackets and automatic climbers as single!section climbing scaffold * Lift heights up to 5.50 m * Formwork systems· • wall formwork FF 20 and large!area formwork Top 50 • framed formwork Framax and Alu!Framax * Climbing speed 5 min/m SKE 50 * Load!carrying ...

Affordable formwork system patent That Your Business Needs

ZPM!100 Hydraulic Automatic modular circular Climbing Formwork steel and timber systems. US $6691!$7360 / Set. 10 Sets (Min. Order)

Auto-climbing Formwork, Auto-climbing Formwork direct from

ZPM-100 Hydraulic Automatic modular circular Climbing Formwork steel and timber systems. $6:691.00 - $7:360.00 / Set. 10 Sets (Min. Order)

PERI GmbH -

Abstract· The invention relates to a self-climbing system (10), in particular a self-climbing formwork system, comprising at least one climbing rail (12, 14) which is guided on at least two climbing shoes (16, 16′, 16″), in particular an upper and a lower climbing shoe, wherein the climbing shoes (16, 16′, 16′) can be fastened on and/or on top of a cured concreting section (18, 18 ···